This project consists of two major components:

(i) The construction of a dam and 120 MW powerhouse along the Alimit River, and a  transfer tunnel from the Ibulao River with a 20 MW powerhouse sited on the outlet of the  tunnel. 
(ii) 20 km transmission line (TL) project which connects to a new substation in Magat HEPP and then to an upgraded T-line to Santiago City.